top of page

Projects

Some of the projects we have been entrusted with include the following;

  • Decommissioning and removal of Cameron Mark I BOP control system followed by full installation and commissioning of a Cameron Mark III system.

  • Installation and commissioning of NOV Mark V BOP control system, without OEM assistance. 

  • Design review of Hydril BOP Mux control system.

  • Design, manufacture and supply of new BOP control panels including PLC software.​

  • Expert witnesses for contractural legal case between Drilling contractor and Operator. 

  • System lifetime maintenance spanning over 20 years.

WHP 3.jpg
Panel Rear.jpg
bottom of page